Article Date: 12/20/2004


OUTSIDE THE BOX—SHARED PROJECT CONTROL


By Farid W. Saddik

Introduction

The integration of technology into most business sectors has accelerated exponentially during the last decade or so. The pace of integration was not matched by the necessary changes in the legal system at large, and in contracting in particular. The result was chaotic reaction to events and conflicts rather than deliberate ... Log in to view the full text.

 



NOT YET A SUBSCRIBER?

Purchase a Subscription
with a money-back guarantee
and immediate access

Already a member?

Email:

Password:











WPL
PUBLISHING CO, INC.
WPL Publishing - 5750 Bou Avenue #1712 - Rockville, MD 20852

Phone: (301)983-0443  -  Fax: (301)983-4367

All Content and Design Copyright © 2026 WPL Publishing
About Us

Contact Us

Privacy Policy

My Account